Rose Rotana Tower Shoring, Dewatering, Excavation & Piling Works
(Dubai / United Arab Emirates)

 
ClientM/S. Abdulla Bin Brouk Facility
ControlKhatib & Alami
Main ContractorArabian Construction Co. (ACC)
 
Rose Rotana Tower is the highest hotel structure of the world. The site is on Sheikh Zayed Road, Trade Center, Dubai, UAE. Design and construction of shoring by secant piles (using bentonite piles and jetgrouting), 1 level of anchors. Construction of 121 nos of working piles (1000 mm dia, 46 m length), 1 preliminary test (3,000 tons) with instrumentation of the test pile, 2 static tests on working piles, dynamic tests, caliper logging, sonic coring and integrity tests, dewatering by deep wells.

 



    

 

Back to Projects List

Rose Rotana Tower Shoring, Dewatering, Excavation & Piling Works
(Dubai / United Arab Emirates)

 
ClientM/S. Abdulla Bin Brouk Facility
ControlKhatib & Alami
Main ContractorArabian Construction Co. (ACC)
 
Rose Rotana Tower is the highest hotel structure of the world. The site is on Sheikh Zayed Road, Trade Center, Dubai, UAE. Design and construction of shoring by secant piles (using bentonite piles and jetgrouting), 1 level of anchors. Construction of 121 nos of working piles (1000 mm dia, 46 m length), 1 preliminary test (3,000 tons) with instrumentation of the test pile, 2 static tests on working piles, dynamic tests, caliper logging, sonic coring and integrity tests, dewatering by deep wells.

 



    

 

Back to Projects List

Rose Rotana Tower Shoring, Dewatering, Excavation & Piling Works
(Dubai / United Arab Emirates)

 
ClientM/S. Abdulla Bin Brouk Facility
ControlKhatib & Alami
Main ContractorArabian Construction Co. (ACC)
 
Rose Rotana Tower is the highest hotel structure of the world. The site is on Sheikh Zayed Road, Trade Center, Dubai, UAE. Design and construction of shoring by secant piles (using bentonite piles and jetgrouting), 1 level of anchors. Construction of 121 nos of working piles (1000 mm dia, 46 m length), 1 preliminary test (3,000 tons) with instrumentation of the test pile, 2 static tests on working piles, dynamic tests, caliper logging, sonic coring and integrity tests, dewatering by deep wells.

 



    

 

Back to Projects List

Rose Rotana Tower Shoring, Dewatering, Excavation & Piling Works
(Dubai / United Arab Emirates)

 
ClientM/S. Abdulla Bin Brouk Facility
ControlKhatib & Alami
Main ContractorArabian Construction Co. (ACC)
 
Rose Rotana Tower is the highest hotel structure of the world. The site is on Sheikh Zayed Road, Trade Center, Dubai, UAE. Design and construction of shoring by secant piles (using bentonite piles and jetgrouting), 1 level of anchors. Construction of 121 nos of working piles (1000 mm dia, 46 m length), 1 preliminary test (3,000 tons) with instrumentation of the test pile, 2 static tests on working piles, dynamic tests, caliper logging, sonic coring and integrity tests, dewatering by deep wells.

 



    

 

Back to Projects List

 
 Home     Site Map

Zetas Zemin Teknolojisi A.S.

  Alemdag Merkez Mah.
      Resadiye Cad. No: 69/A
      34794 Cekmekoy-Istanbul / TURKEY

  +90-216-430 06 00
  +90-216-484 41 74
  info@zetas.com.tr

Supports Rising Values

Zetas is active and an internationally recognized brand name in foundation engineering and contracting having operations in ten (10) different countries in Central Asia and Middle East including Turkey, as well as being a part of global network of geotechnical resources and expertise.

Web Design & Applications: IstanbulNet