The Strategic Water Storage and Recovery Project
(Abu Dhabi / United Arab Emirates)

 
ClientAbu Dhabi Water and Electricity Authority
ControlDornier Consulting & GTZ
Main ContractorACC & Posco JV
 

The project is being constructed about 250 km south west of Abu Dhabi City - is based on an infiltration basin/recovery well system known as aquifer storage and recovery, which features water pipe lines, HV transmission lines, pump stations and a SCADA system.

ZETAS ATS is awarded for the Well Related Works which includes but is not limited to the scope of Water Well Drilling - Development - Construction - Testing and Hydrogeological Modeling.

 



      

  

 

Back to Projects List

The Strategic Water Storage and Recovery Project
(Abu Dhabi / United Arab Emirates)

 
ClientAbu Dhabi Water and Electricity Authority
ControlDornier Consulting & GTZ
Main ContractorACC & Posco JV
 

The project is being constructed about 250 km south west of Abu Dhabi City - is based on an infiltration basin/recovery well system known as aquifer storage and recovery, which features water pipe lines, HV transmission lines, pump stations and a SCADA system.

ZETAS ATS is awarded for the Well Related Works which includes but is not limited to the scope of Water Well Drilling - Development - Construction - Testing and Hydrogeological Modeling.

 



      

  

 

Back to Projects List

The Strategic Water Storage and Recovery Project
(Abu Dhabi / United Arab Emirates)

 
ClientAbu Dhabi Water and Electricity Authority
ControlDornier Consulting & GTZ
Main ContractorACC & Posco JV
 

The project is being constructed about 250 km south west of Abu Dhabi City - is based on an infiltration basin/recovery well system known as aquifer storage and recovery, which features water pipe lines, HV transmission lines, pump stations and a SCADA system.

ZETAS ATS is awarded for the Well Related Works which includes but is not limited to the scope of Water Well Drilling - Development - Construction - Testing and Hydrogeological Modeling.

 



      

  

 

Back to Projects List

The Strategic Water Storage and Recovery Project
(Abu Dhabi / United Arab Emirates)

 
ClientAbu Dhabi Water and Electricity Authority
ControlDornier Consulting & GTZ
Main ContractorACC & Posco JV
 

The project is being constructed about 250 km south west of Abu Dhabi City - is based on an infiltration basin/recovery well system known as aquifer storage and recovery, which features water pipe lines, HV transmission lines, pump stations and a SCADA system.

ZETAS ATS is awarded for the Well Related Works which includes but is not limited to the scope of Water Well Drilling - Development - Construction - Testing and Hydrogeological Modeling.

 



      

  

 

Back to Projects List

 
 Home     Site Map

Zetas Zemin Teknolojisi A.S.

  Alemdag Merkez Mah.
      Resadiye Cad. No: 69/A
      34794 Cekmekoy-Istanbul / TURKEY

  +90-216-430 06 00
  +90-216-484 41 74
  info@zetas.com.tr

Supports Rising Values

Zetas is active and an internationally recognized brand name in foundation engineering and contracting having operations in ten (10) different countries in Central Asia and Middle East including Turkey, as well as being a part of global network of geotechnical resources and expertise.

Web Design & Applications: IstanbulNet