Ildiri Grouting Works Against Salt Water Intrusion
(Cesme / Izmir / Turkey)

 
ClientState Water Works
Main ContractorSistem Yapı A.Ş.
 
A grouting curtain was constructed parallel to shore line in Ildırı Çeşme İzmir. The water supply for the town of Çeşme İzmir have been supported by the groundwater wells located near to shore line. In order to stop sea water (salt water) intrusion into groundwater reserves a grouting curtain was constructed close to sea shore line. The soil conditions consisted of limestone with cavities underlying an alluvial cover of limited thickness. The total length of grout curtain was close to 2 km with depths varying between 10 m to 30 m.

 



  

 

Back to Projects List

Ildiri Grouting Works Against Salt Water Intrusion
(Cesme / Izmir / Turkey)

 
ClientState Water Works
Main ContractorSistem Yapı A.Ş.
 
A grouting curtain was constructed parallel to shore line in Ildırı Çeşme İzmir. The water supply for the town of Çeşme İzmir have been supported by the groundwater wells located near to shore line. In order to stop sea water (salt water) intrusion into groundwater reserves a grouting curtain was constructed close to sea shore line. The soil conditions consisted of limestone with cavities underlying an alluvial cover of limited thickness. The total length of grout curtain was close to 2 km with depths varying between 10 m to 30 m.

 



  

 

Back to Projects List

Ildiri Grouting Works Against Salt Water Intrusion
(Cesme / Izmir / Turkey)

 
ClientState Water Works
Main ContractorSistem Yapı A.Ş.
 
A grouting curtain was constructed parallel to shore line in Ildırı Çeşme İzmir. The water supply for the town of Çeşme İzmir have been supported by the groundwater wells located near to shore line. In order to stop sea water (salt water) intrusion into groundwater reserves a grouting curtain was constructed close to sea shore line. The soil conditions consisted of limestone with cavities underlying an alluvial cover of limited thickness. The total length of grout curtain was close to 2 km with depths varying between 10 m to 30 m.

 



  

 

Back to Projects List

Ildiri Grouting Works Against Salt Water Intrusion
(Cesme / Izmir / Turkey)

 
ClientState Water Works
Main ContractorSistem Yapı A.Ş.
 
A grouting curtain was constructed parallel to shore line in Ildırı Çeşme İzmir. The water supply for the town of Çeşme İzmir have been supported by the groundwater wells located near to shore line. In order to stop sea water (salt water) intrusion into groundwater reserves a grouting curtain was constructed close to sea shore line. The soil conditions consisted of limestone with cavities underlying an alluvial cover of limited thickness. The total length of grout curtain was close to 2 km with depths varying between 10 m to 30 m.

 



  

 

Back to Projects List

 
 Home     Site Map

Zetas Zemin Teknolojisi A.S.

  Alemdag Merkez Mah.
      Resadiye Cad. No: 69/A
      34794 Cekmekoy-Istanbul / TURKEY

  +90-216-430 06 00
  +90-216-484 41 74
  info@zetas.com.tr

Supports Rising Values

Zetas is active and an internationally recognized brand name in foundation engineering and contracting having operations in ten (10) different countries in Central Asia and Middle East including Turkey, as well as being a part of global network of geotechnical resources and expertise.

Web Design & Applications: IstanbulNet