Shoring with bored pileas and prestressed anchors and foundation piles
Quantities :
Shoring with bored piles for a max excavation depth of 10m with 1 row of prestressed anchors, and a total 176 bored piles for the foundations composed of 134 piles with 1300mm dia L=34.8m length and 48 piles with 1200mm dia L=13.3m length