Homepage  |  Contact Us  |  Türkçe
   
 
Mashattan
Istinye Park
Borçelik Gemlik 2007
Espark Eskişehir
Nippon Hotel
Şişli Hotel project
Koşuyolu Hospital
American Hospital - Dubai
SharjahMall
Etihad Towers
Elite Tower
Geant Shopping Mall
Al Basti Muktha
Commercial Bank Of Dubai
Investbank
Princess Tower
Rose Tower
Borçelik 2003
Anadyr, Siberia
Çobançeşme Interchange
Güney Plaza
Nazif Pasa Waterfront House
Tekfen Tower
Baku, SPS Yard
Kanyon
Tire Cigarette Factory
Kale Shopping Center
 
  Princess Tower
     
 
Name of Project :   Princess Tower
Client :   Mr. Saleh Nasser Abdulaziz Al Sareea Abdulla Hamad Ibrahim Al Nashal Tameer Al Emarat Est. (Tameer), Eng. Adnan Saffarini Design, Supervision & Consultants
Date :   2005-2006
Location :   Dubai
Job Description :   Shoring with diaphragm wall and foundation piles
Quantities :   Shoring for a total of 338m periphery with diaphragm wall for a max excavation depth of 22m with 4 rows of prestressed anchors, and a total 150 bored piles for the foundations composed of 101 piles with 1500mm dia L=45m length, 5 piles with 1200mm dia L=18-30m length and 44 piles with 1000mm dia L=12m length
Soil Conditions :   Sand, Sanstone
Duration :   8 months
 
© ZETAŞ Zemin Teknolojisi A.Ş. 2007