Process controls concreting with a tube that is deployed as the full length auger is raised and monitors drilling curves and concrete placement in real time.
![Resim22](https://www.zetas.com.tr/wp-content/uploads/sites/11/2021/07/Resim22.jpg)
SBFS, Soletanche Bachy
![Resim23](https://www.zetas.com.tr/wp-content/uploads/sites/11/2021/07/Resim23.png)
Related Projects
Work with us
We at ZETAŞ, are able to provide our customers with top-notch design and value engineering thanks to our highly educated engineers in addition to our experience in contracting.
![4-6_ckale1915](https://www.zetas.com.tr/wp-content/uploads/sites/11/2021/07/4-6_ckale1915.jpg)