Project Information
Diaphragm walls with jet grout toe improvement and pre-stressed anchors were applied to support the basement excavation. The foundation of the structure is built on barrettes and bored piles. An O-Cell loading test was performed on the test barrette.
0m2
Diaphragm Wall
0m
Pre-stressed Anchor
0m
Jet Grout
0m
Barrettes
0m
Bored Pile
Employer:
DAAX Construction
Project:
Central Bank of Iraq Project
Country:
Iraq
Year:
2018
Related Techniques
Related Projects
Work with us
We at ZETAŞ, are able to provide our customers with top-notch design and value engineering thanks to our highly educated engineers in addition to our experience in contracting.
![4-6_ckale1915](https://www.zetas.com.tr/wp-content/uploads/sites/11/2021/07/4-6_ckale1915.jpg)